Developer profile

China Longyuan Power

outlook pending

About

No authored description yet.

Outlook

Strategic outlook pending

China Longyuan Power has a live portfolio below, but no authored strategic profile yet — stated targets, capital discipline, and the timeline of public statements. Strategic coverage rolls out developer by developer; the portfolio here is derived live in the meantime.

Portfolio

13 held · live stages first, exits last
Operational · 2.39 GW (10)Under Construction · 0 GW (2)Proposed · 0.30 GW (1)

Capacity is net of ownership stake: a 50% JV counts half. Gross exposure (full nameplate of every project held): 3.09 GW. Some stakes are undisclosed, so net GW is a floor.

ProjectCountryStageMWStakeNet MW
Putian Nanridao China Operational 400 100% 400
Jiangjiasha H1 China Operational 350 100% 350
Dafeng H4 Longyuan China Operational 303 100% 303
Dafeng H6 Longyuan China Operational 303 100% 303
Sheyang Southern H2 China Operational 302 100% 302
Rudong C4 Longyuan China Operational 200 100% 200
Dafeng H7 Longyuan China Operational 200 100% 200
Rudong Longyuan Intertidal Demonstration China Operational 195 100% 195
Sheyang Southern H2-1 China Operational 104 100% 104
Rudong Intertidal Zone Experimental China Operational 32 100% 32
Jiangsu Dafeng H2 (Longyuan) China Under Construction 300 — —
Jiangsu Dafeng H2-1 (Longyuan) China Under Construction 100 — —
Sheyang Southern H4 China Proposed 300 100% 300